University of Nebraska Scott Engineering Center

Project type

Higher Education

Date

September 2019

Location

Nebraska

Roles and Responsibilities


- Participated in the full project development from initiation to termination.

- Facilitated and led weekly meetings with clients, contractors, and consultants.

- Conducted weekly meetings with stakeholders to ensure alignment.

- Participated in client meetings to gather requirements and feedback.

- Led Revit BIM modeling efforts.

- Led 2D/3D modeling efforts to enhance project visualization.

- Produced high-quality design renders for client presentations.

- Created professional project presentations to showcase progress.

- Participated in multidisciplinary team meetings to ensure project coherence.

- Supervised teams of less experienced architects.

The UNL College of Engineering is developing a facility that will engage and serve all its constituencies—including current and future students, faculty, staff, engineering partners, and the public—in innovative, creative, and exciting ways. This facility aims to transform engineering teaching, research, and practice at the University of Nebraska, impacting the state and the world.

**Project Description:**

The project involves demolishing the Scott Engineering Center (SEC) Link and constructing a new lab addition adjacent to the north facade of SEC. The new addition will align with the existing floor levels within SEC and connect to Nebraska Hall via ramps and stairs.

Numerous improvements will be made to Nebraska Hall, including new offices and classroom spaces to accommodate those displaced by the Link demolition, new ADA-compliant entrances on the north elevation, various ADA upgrades, and the installation of fire sprinklers throughout the building.

Additionally, a mechanical tower will be constructed along the east side of SEC to serve the first and second floors via horizontal ductwork. The third floor of SEC will be served horizontally from equipment located in a penthouse on the new addition.

bottom of page